East Argent Loop Road is an 8,400 lf. spine road in Hardeeville, SC built to support several upcoming communities. J.H. Hiers responsibilities include clearing, mass grading, two sanitary lift stations, offsite forced main, sanitary sewer, waterline, storm drain, curb and gutter, and asphalt paving.
Challenges and Unique Details
The main challenge faced on this project was working in a low lying area. Most of this road was weaved between several existing wetlands.
Project Results
This project kicked off in the middle of the wet season and J.H. Hiers Construction was able to import dry material from and offsite borrow pit to keep the project moving. During utilities and lift station installation we utilized several dewatering methods to stay ahead of the water table.
Type of Project
Roadway and Utility Construction
Scope of Work
Clearing and grubbing, Mass Grading, Regional Lift Station, Lift Station, Offsite Forced Main Installation, Storm Drain, Waterline, Curb and Gutter and Asphalt Paving
Location
Hardeeville, SC
Owner
Preserve Communities